the "sheep-simonet stop"
we enjoy our last major marathon to start the program "plumbing-electrical-wall", we spent the 2 / 3 of the floor and floor ducts (electrical outlets and lighting), and have mounted a number of panels fermacell
we also selected and ordered the tile floor of
walls of rooms 3 and 4
partition separating the chambers 1 and 2, we left the waiting party will be accommodated where plenums insufflation of vmc (still not received ...)
a view of the stage: finally we manage a toilet (right in photo) and a small bathroom (left) equipped with a shower tray and sink for taking the time to make a "great" room bathroom on the floor ... and have enough to wash in 2 months! and also to organize future toilets inside and outside (composteur. ..)
tip of construction: a stool, a roll of brake-power card, and go!
big thank you to our "coach electricity" Franck; pass ducts is easy, but the plug is a profession ...
it starts to turn the world on the floor! strongly that all this disappears in the insulation ...
and a big thank you to Emily and Frantz for taking children on holiday and this photo wide angle