frames and partitions to partitions
further doubling of erecting walls, still in Douglas (6X4 cm), and these side frames are screwed into the studs, joists, and secured by tape-vis the slab
ago, the window surrounds have been stuck for the perfect airtightness, the brake horsepower is connected to the slab by a textile membrane adhered to the "ORCON F
Doubling of the bathroom and service room done, he only needs electrical ducts before closing with fermacell ...
Meanwhile Helen has started laying the bricks, straw between amounts (8X4cm) intermediate wall and a small slip on top, and hop ...
land has been put back to frost! the house retains the same temperature for a good week (between 8 and 10 degrees) despite the frosts
a short day's work to achieve first partition (here between the technical and residence)
Erwin thank you for having submitted the idea of crocodile saw to crosscut the mud bricks and straw: it will own and much faster! the cutter, it sucks (especially by consuming a plate by brick)
"How beautiful the earth-cutters on Saturday,"
we agrafons mesh on the amounts in order to avoid the cracking phenomenon between wood and straw, and ensure good performance of the coating because the bricks are only of filler
the partition separating equipment room and lounge is already well under way Sunday evening to follow ...