a brief summary of the last 3 weeks
the 120 beams are sanded, nicked
we benefited from the return of RTT with the fall to make the 240 joists and battens have begun to set
two crossbars are fixed gable We took the opportunity to put in place the steam brake "Highbrow" behind them in order to have total continuity throughout the interior wall
poles are 2 / 3 cut
still a little rain-Its front and top of boots to put .. .
lifting floor joists of the weekend of October 15th!