Thursday, December 23, 2010
Wednesday, December 22, 2010
Can I Borow Doujin-moe Account
screed Christmas
the pouring of the topping scheduled last Friday finally took place today Wednesday because of weather ... it is a screed called "anhydrite" of a thickness of 7 cm, and levels off by itself ... a small broom, and presto, tile glued directly over ... but not before 7 weeks of drying (1 week per centimeter)
start pouring
once reached the desired thickness, the screed is "vibrated" a first After thoroughly to remove air bubbles, then a second time to refine the surface leveling (above)
and here is the result! 47 m2 with tiled ... the formwork on the left is the location of the shower (for those not recognized), deep kitchen sink, and in the foreground, evacuation and feeding the washing machine ... "But-why-he-is-like-it-the-pipe? Bin because the supervisor, he had not been back in the right place ... this one, it will always make us c. ...
if the bales are finite in northern facade (those still in the ceiling above joists), the blades of the ceiling of the ground floor are planed and machined ...
the pouring of the topping scheduled last Friday finally took place today Wednesday because of weather ... it is a screed called "anhydrite" of a thickness of 7 cm, and levels off by itself ... a small broom, and presto, tile glued directly over ... but not before 7 weeks of drying (1 week per centimeter)
start pouring
once reached the desired thickness, the screed is "vibrated" a first After thoroughly to remove air bubbles, then a second time to refine the surface leveling (above)
and here is the result! 47 m2 with tiled ... the formwork on the left is the location of the shower (for those not recognized), deep kitchen sink, and in the foreground, evacuation and feeding the washing machine ... "But-why-he-is-like-it-the-pipe? Bin because the supervisor, he had not been back in the right place ... this one, it will always make us c. ...
if the bales are finite in northern facade (those still in the ceiling above joists), the blades of the ceiling of the ground floor are planed and machined ...
Sunday, December 12, 2010
Lorazepam Mixed With Benadryl
laying cork boards
program of the weekend: laying cork boards
cutting, leveling, plating-with a little sand
brake adjustment steam, so it stays in place when the screed
and formwork (separation between the living room with wooden floors and kitchen with tile)
a little housekeeping ... tomorrow and the carpet ...
program of the weekend: laying cork boards
cutting, leveling, plating-with a little sand
brake adjustment steam, so it stays in place when the screed
and formwork (separation between the living room with wooden floors and kitchen with tile)
a little housekeeping ... tomorrow and the carpet ...
Sunday, December 5, 2010
Beyblades Ina Australian Shops
cow!
Finally, we can begin to interior decorating our future: a beautiful thermometer selected by Naomi! it shows this Friday for a 2 ° outside temperature of -4 °, without doors and the north wall have not yet been isolated, not bad ...
you have another little straw for the north face Friday with Geoffrey and Christian
Saturday with Charlie, and also John the Baptist and Blandina, future builders straw recalibration program the "willy-boot" (graduated with honors) ...
... assembly / disassembly of the scaffolding ...
... and setting up the boots easy and not easy (high walls): graduation with honors "tonic" (ah yes, we see that John has done boxing ...)
Saturday night it only remains to put the boots over the door: ben my little pig, what a weekend!
Sunday afternoon we rest by laying the pipes hot and cold water ... much preparation before the pouring of the topping on 17
big thank you to Geoffrey, Christian, Jean-Baptiste said, "Gascon," Blandine, Charly and Jean Pape (for custody of the 3 little sheep)
Finally, we can begin to interior decorating our future: a beautiful thermometer selected by Naomi! it shows this Friday for a 2 ° outside temperature of -4 °, without doors and the north wall have not yet been isolated, not bad ...
you have another little straw for the north face Friday with Geoffrey and Christian
Saturday with Charlie, and also John the Baptist and Blandina, future builders straw recalibration program the "willy-boot" (graduated with honors) ...
... assembly / disassembly of the scaffolding ...
... and setting up the boots easy and not easy (high walls): graduation with honors "tonic" (ah yes, we see that John has done boxing ...)
Saturday night it only remains to put the boots over the door: ben my little pig, what a weekend!
Sunday afternoon we rest by laying the pipes hot and cold water ... much preparation before the pouring of the topping on 17
big thank you to Geoffrey, Christian, Jean-Baptiste said, "Gascon," Blandine, Charly and Jean Pape (for custody of the 3 little sheep)
Monday, November 29, 2010
Money Plus Growth 180
For over fifty years, candles Broste , a family company, illuminates the long nights and warm interiors Danish winter.
The candles are now sold around the world (Truffaut, Jardiland and Botanic notably France) and beautiful Christmas deco in natural materials and delicate ornaments were added to the collection ..
Sunday, November 28, 2010
How A Sailboat Works Diagram
straw that weekend snow and a small quilt batting
In We also it snowed! ... And if the attic? the view is beautiful! (Uh, not intended ...)
spill cotton wool, covered by the brake-power panels and "DFP"
is batting or Scotch they prefer? we rather it is the beer ...
connecting strips brake-power horizontal and vertical are filled past the top of straw bales with loose cork, the walls are bonded with the joists through panels DFP
Sunday tonight, the insulation is over ... more than a few panels! To be continued ...
next weekend: climbing the north face by straw bales!
In We also it snowed! ... And if the attic? the view is beautiful! (Uh, not intended ...)
spill cotton wool, covered by the brake-power panels and "DFP"
is batting or Scotch they prefer? we rather it is the beer ...
connecting strips brake-power horizontal and vertical are filled past the top of straw bales with loose cork, the walls are bonded with the joists through panels DFP
Sunday tonight, the insulation is over ... more than a few panels! To be continued ...
next weekend: climbing the north face by straw bales!
Monday, November 22, 2010
How To Install Tally 9server
Danish Christmas In Paradise The Serendipity
Serendipity adventure began in 2004 with its first boutique in Paris.
A small charming shop and quickly charmed its customers with its vintage furniture, unique pieces, original creations to the world of small but also larger.
The store moved a few meters into a larger space (81-83, rue du Cherche-Midi 75006 Paris
) and now also offers its collection online at:
serendipity.fr
What some antiquing id é es Cadea ux!
Serendipity adventure began in 2004 with its first boutique in Paris.
A small charming shop and quickly charmed its customers with its vintage furniture, unique pieces, original creations to the world of small but also larger.
The store moved a few meters into a larger space (81-83, rue du Cherche-Midi 75006 Paris
) and now also offers its collection online at:
serendipity.fr
What some antiquing id é es Cadea ux!
Sunday, November 21, 2010
How Much Time For Colyte To Take Effect
for winter
we started the first installment of the roof insulation, to complete interior work while Frost: So the program, 13 cm of tissue paper in bulk, placed between the ceiling joists Douglas, which we previously covered with a breathable Kraft to avoid the impact of cotton dust in the lower parts
the relative leniency of the time we can finally finish the East side, that is to say the last straw bales and the rain-wood fiber, the work of setting up boots the front is greatly facilitated by the presence of door-joists and joist girders connected to I. .. it no longer bounces!
Helena (and boys) have isolated the first span of the joists and are covered with the brake-power, which will be stapled and taped with that covering the walls, thus ensuring good continuity in the barrier the air, all will be covered DFP panels tongue and groove and then (in spring) by a layer of straw bales ... should be well heated in the rooms!
a job with prospects ...
end result of the day
the East side is closed, the north facade remains to be boots (weekend of December 4 and 5)
we started the first installment of the roof insulation, to complete interior work while Frost: So the program, 13 cm of tissue paper in bulk, placed between the ceiling joists Douglas, which we previously covered with a breathable Kraft to avoid the impact of cotton dust in the lower parts
the relative leniency of the time we can finally finish the East side, that is to say the last straw bales and the rain-wood fiber, the work of setting up boots the front is greatly facilitated by the presence of door-joists and joist girders connected to I. .. it no longer bounces!
Helena (and boys) have isolated the first span of the joists and are covered with the brake-power, which will be stapled and taped with that covering the walls, thus ensuring good continuity in the barrier the air, all will be covered DFP panels tongue and groove and then (in spring) by a layer of straw bales ... should be well heated in the rooms!
a job with prospects ...
end result of the day
the East side is closed, the north facade remains to be boots (weekend of December 4 and 5)
Sunday, November 14, 2010
How To Conceal Eyebrow Burn
basement to the attic joists
the ceiling finished and now: the bottom
top view
1200 Douglas blades with a length of 28 cm: it could not be simpler? well no, because we can find the result very nice ...
we have been helped throughout the weekend by Tom and Marius!
Friday was devoted to finalizing the connection of mains drainage and utility lines: more tangled hoses that hang outside the house!
poses a glance access to different ducts in the corner (so we can intervene If wires stuck)
Meanwhile, in the carpentry workshop ... courage, more than 800 cutting blades!
Fixing joists after being reduced to the strap
the ceiling finished and now: the bottom
top view
1200 Douglas blades with a length of 28 cm: it could not be simpler? well no, because we can find the result very nice ...
we have been helped throughout the weekend by Tom and Marius!
Friday was devoted to finalizing the connection of mains drainage and utility lines: more tangled hoses that hang outside the house!
poses a glance access to different ducts in the corner (so we can intervene If wires stuck)
Meanwhile, in the carpentry workshop ... courage, more than 800 cutting blades!
Fixing joists after being reduced to the strap